Practical Takeaway: Leave with a clearer approach for turning early drawing information and project assumptions into a more realistic, team-informed pre-construction schedule before mobilization
- Connecting schedule with controls data to create a clearer view of project and program performance
- Aligning project-level schedules with program-level objectives to bridge bottom-up execution and top-down strategy
- Clarifying where scheduling sits within project controls
Practical Takeaway: Leave with a clearer understanding of how scheduling can sit within a broader project controls function, whether their organization has a mature controls team or is still defining what project controls should look like