Panel: Navigating the Shift from Legacy Scheduling Systems to Integrated Platforms Without Losing Control
- Assessing what teams need from new platforms beyond cost, including usability, data access, and CPM capability
- Managing system transitions without creating duplicated workflows, disconnected data, or extra reporting burden
- Aligning all stakeholders around implementation, governance, and adoption
Practical Takeaway: Leave with a checklist for evaluating and transitioning scheduling systems without compromising schedule quality, visibility, or team adoption